Construction projects realized in just a few months

Our team of experienced technicians and planners covers all service phases

We accompany your project from the initial idea to the handover of keys. We take a holistic approach, including advice on funding and ESG compliance, ensuring maximum planning security and measurable ecological added value. Whether you are a project developer, housing association or municipal client, we offer you:

01 Consulting

Indication
Modular
Concept
Pre
Construction
Funding

02 Planning

Preliminary planning
Design planning
Execution planning

03 Realization

Construction
Components
Field factory
Modular construction
Finishing

01

Consulting

Recognizing modular opportunities – consulting for
sustainable development and efficient implementation

We support you in identifying building potential on properties or in neighborhoods, translate your construction task into a modular, resource-saving concept and check options for a PreConstruction contract.

Indication

We analyze unused space reserves on properties and in existing neighborhoods, examine opportunities for densification, roof extensions or potential for energy-efficient renovation – always with a view to urban planning, economic and ecological aspects as well as the long-term development potential of your location.

Modular concept

We translate your individual construction task into a modular concept – flexible, scalable and efficient. We take function, design and construction process into account equally and create the basis for an economical, sustainable and time-efficient realization.

PreConstruction

A PreConstruction contract makes it possible to coordinate planning, feasibility, costs and deadlines together before the actual general contractor construction project. In this way, we create clarity, minimize risks and lay a reliable foundation for successful project implementation.

Funding

We specifically check existing funding programs at federal, state and municipal level for your project. In this way, we identify financial support options that fit the project idea and support you in strategically integrating them into planning and application.

02

Planning

We adapt our planning flexibly to your construction task and construct a modular timber construction from it
Our planners realize any desired mix of apartments – flexibly and independently of the existing building. Thanks to our modular timber construction method, buildings can be designed in such a way that later changes of use can already be considered in the planning. We optimize floor plans according to requirements and efficiently. Different facades, roof shapes or balconies can be easily implemented – for tailor-made solutions that are oriented towards the requirements of today and tomorrow.

Preliminary planning

We analyze unused space reserves on properties and in existing neighborhoods, examine opportunities for densification, roof extensions or potential for energy-efficient renovation – always with a view to urban planning, economic and ecological aspects as well as the long-term development potential of your location.

Design planning

In the design planning phase, we concretize the modular concept architecturally and technically. Room structure, material selection, technical systems and design are coordinated and planned in stages – always with a view to industrial prefabrication, efficiency and later implementation in modular construction.

Execution planning

The execution planning is carried out internally by an interdisciplinary team of civil engineers, architects, draftsmen and timber construction engineers. In this way, we ensure close coordination and guarantee precise, practical planning for modular implementation down to the last detail.

03

Realization

Efficient realization from a single source – from modular construction to handover
From construction to our own component production to module assembly in our mobile hall – we realize every project with our experienced team. The prefabricated modules are moved on site, assembled and handed over ready for occupancy – efficiently, precisely and on schedule.

Construction

Our construction team develops sustainable, modular solutions using timber construction – tailored to structural engineering, fire protection and building physics. In close coordination with planning and production, economical, sustainable structures are created that can be flexibly adapted to architectural and functional requirements.

Components

In component production, standardized 2D components such as walls, ceilings and floors are created from cross-laminated spruce wood, which are delivered just-in-sequence to the mobile field factory. There, the elements are assembled under ideal conditions to create high-quality, three-dimensional room modules – including insulation, windows and facades. Thanks to just-in-time production and standardized processes, consistently high quality is guaranteed.

Field factory

Our mobile field factory is quickly ready for use and positioned directly at the construction site. This reduces transport distances, simplifies logistics and improves the CO₂ balance. Up to 100 m² of prefabricated living space are created daily in high quality. The modules are packed securely for transport, brought to the construction site without special transports and quickly assembled there. Due to the high degree of prefabrication, only a few trades are required – this significantly shortens the construction time and ensures smooth, industrial implementation in wood.

Modular construction

After assembly in LiWooD’s own field factory, the modules are transported directly to the construction site. Due to the high degree of prefabrication – around 80% of the equipment, including fully installed bathrooms, is already completed – the construction time is reduced to a minimum and the burden on residents is significantly reduced. In the case of extensions, it is even possible for residents to remain in their apartments during the entire construction phase.

Finishing

In larger projects with several buildings, the construction phases run in parallel: While the interior work is already being carried out in one building, the dismantling of the roof begins on the next. In this way, processes can be bundled efficiently and the overall construction time can be noticeably shortened. The buildings are handed over to the client ready for occupancy.